0128 GOLDENROD CIRCLE
Keystone

For more information about Kurowski Development, send your request to: info@kurowski.com.

Construction Photos

October 12, 2007

Front Elevation

Front Elevation

Side Elevation

Side Elevation

Rear Elevation

Master Bath

Master Bath Vanity

Powder Room

Great Room with a Great View

Dining Room & Kitchen

View from Entry

May 3, 2007

Landing and Drain Pipe at Rear Patio

Future Gutter at Dining Room Deck

North Garage Area Cleared After Long Winter

Nate Running & Mitering Gutter

Stone Placement at Entry Step

Stone in Progress at Entry

Sawcut Flagstone for Entry

Entry Stone Work

Stone Risers Added

Spring has Arrived!

March 24, 2007

Snow Slowly Melting

View from Entry - Temp Walkway for Stone Work

Building Paper & Lathe for Future Fireplace Stone

Interior Demarcation & Connection for Phone Service

Elevator Control Panel

Hand-Held Master Shower Fixture

Master Tub Fixtures

Powder Room Vessel Sink

February 20-21, 2007
Tile Work in Progress & Lighting Fixtures are Going In

February 13, 2007

Garage Door Staining Complete

Pocket Door Complete & Ready for Paint

Masking for Paint in Progress

Study Window

Dining Room Beams

Entry Area View to Dining Room & Kitchen

Great Room Windows & Beams

West Wall in Kitchen Ready for Splash

Tall Shelf Added

Vanities

Master Bath - View from Tub Area

Tub Window - Ready to Install Tub

December 16 & 26, 2006

Master Vanities

Cabinets at Refrigerator Opening

Gary on Cabinet Install

Cabinet Installation in Progress

Master Bedroom Box Seat

Dining Room Box Beams

Great Room Window Trim

Trim & Siding Complete at Great Room Patio

South Elevation Trim Completed

December 12, 2006

Master Tub Apron in Progress

Master Tub Splash - Chair Rail Added to Apron

Master Shower with Accent Row & Listelles

Windows Cased in Alder - Bedroom 2

Doors Stocked for Future Install

Trim Carpenter Set Up in Study

Dining Room - Hall Columns

Please Excuse the Blurry Photo

Dining Room Half Columns in Progress

Master Closet Shelves

December 6-8, 2006

Slate Entry Complete with Initial Seal Coat

Rosin Paper Complete - Misc Cleanup for Hardwood

Mark Collier Starting Hardwood Layout

Hardwood Complete - Area Left Open for Island Wiring

Hardwood Complete - Dining Room Hall to Great Room

Trim & Doors - Delivered & Stocked

Garage Door Opener Operational Via Remote Power

Study Deck - Partial Deckmasters for Blind Screws

Great Room & Master Deck

December 5, 2006

Grace Deck Protector Prior to Trex at Dining Room Deck

Grace Deck Protector at Family Room Deck

3/4" Plywood Installed Ahead of Walnut Flooring at Kitchen Island Area

Tile in Progress at Front Entry

Tile at Front Entry - Sealer Applied to Mosaic Inlay

Plywood Complete

Hardwood Stocked in Home (Nov. 30th) to Acclimate to Site Conditions

Future Accent at Bath #3 Tub Area

Future Listelle & Chair Rail at Tub Apron

Tile Team - George & Gustavo

Cedar Clad Garage Door Installed

Garage Door Installed After Garage Drywall & Paint

Laundry Room Floor Tile & Plywood Nearing Completion

November 22, 2006

Hand Trowel Texturing at Master Hallway

Hand Troweled Texture at Dining Room Window

Presidential TL Shingles Nearly Complete

Fauxcrete Drive Apron and Roofing at Garage

Fauxcrete Drive Apron after Protective Tent Removed

Front Elevation with Drive Apron

Front Elevation from Shared Driveway

Drain Thru Stone Post at Planter Box

Initial Drive Cleanup for Drive Overlay

Clean Driveway for Asphalt Overlay

Prep and Tack for Driveway Overlay

Asphalt Truck Complete with Heated Hoppers

Hand Spread Asphalt Material

Final Roll of 2" Drive Overlay

Finished Drive Overlay, Feathered at Existing Drive and Street

November 9, 2006

Munchin Boiler in Place and Operational

Compact Size - High Output at an Efficient Level

A Maze of Valves & Pecs for Whole House Distribution

Boiler Area Tented Ahead of Floor Installation & Drywall Sanding

Roof Stocked - View to North

Siding & Trim Above Bedroom #2

Additional Flashing and Grace Ice & Water at Eaves

Presidential TL Ridge Shingles

Shingles in Progress at Closed NE Valley - Not Trimmed

Shingles in Progress Over Bedroom #3 & Garage

November 2-7, 2006

Garage Insulation & Poly

Ceiling Insulation and Poly at Great Room

Insulation Added to Twilight Fireplace

Drywall Hang in Progress at Dining Room Vaults

Drywall Hang in Study is Complete

Use of Durock at Wet Areas

Durock at Master Splash

Drywall at Master Bay with Round Corner Bead

Exterior Trim at Great Room Window

Kitchen & Dining Room Trim

Chimney Stone in Progress

Chimney Stone 80% Complete

Drive Apron Formed with Mesh & Ready for Pour

Last Concrete Pour at Drive Apron

Wheelbarrow Concrete to Rear Patio

Auxiliary Heat Under Poly Tent for Rear Patio Cure

Rear Patio Poured & Finished

Drive Pour in Progress with Stamp

Faux Stamp - Starting at Garage Slab

Tent & Auxiliary Heat in Place for Cure

Tent in Place & Heaters in Operation

Flatwork Crew to Demob and Clean Up

October 27-31, 2006

Dining Room Deck - Trim in Progress

Family Room Wall - Trim in Progress

North Elevation Trim Complete

Pulling Snow Off the Roof

Roof Clear of Snow at Study Deck

2" Rigid Foam (R-10 Value) Installed and Sealed Over Wall Insulation at Master Tub Area

Blown Cellulose Covered with Poly Vapor & Air Barrier

Drain Backfill & Prep for Future Drive Apron

Drain Installed from Rear Patio - Note-Heat Tape Clamped to Invert