14590 W. 58TH PLACE
Arvada

The following are photos of the construction progress on 14590 W. 59th Place.

Click on photos to enlarge:

Vaulted Ceiling at Entry Door

Tile Detail in Guest Bath

View from Master Suite to Patio

View from Study into Master Suite

Master Vanity with Finished Tile Mirror Frame

Master Vanity

Master Tub

Master Shower Tile Detail

Family Room Media Center & Fireplace

Finished Nook Ceiling

A View into the Kitchen

Oversized Kitchen Island

Front Elevation

Stone Turret & Metal Roof

View from Patio of Solar Array

View from Master Suite to Patio

Stone & Stucco Work and Fireplace Dome

BBQ Island

Iron Rail & Sanded Hardwood Ready for First Coat

Hardwood Sanding in Progress

George Working on Tiled Mirror Frame

Energy Saving Tankless Water Heater

Erosion Blanket

Detail Work at Valley in Progress

Master Round Tub Deck

Kitchen Countertops are Protected

Entry Ceiling

Dining Room Ceiling & Light Fixture

Morning Room Ceiling & Light Fixture

Doors to Mechanical Room are Temporarily Sealed

Sink in Basement Bath

Basement Bar

Rear Elevation

Driveway being Poured

Long's Peak is Visible from Roof

Roof Brackets for Solar Panels

Alder Stairs are Stained

Interior Doors are Stained & Sealed

Study Bookshelves are Stained

Basement Bath Vanity is Stained

Stain Work in Progress

Rigid Insulation at Unfinished Areas of Basement

Unfinished Basement is Insulated

DOW Thermax Insulation at Unfinished Basement Areas

Prep Frames for Caulking Joint

Stone Work is Finished

Turret & Chimney

Dry Stack Stone

Master Bedroom Chimney

Stocking GEM Roof Tiles

GEM Roof Tiles have Arrived

Mason

Mason at Work

Mason Working by Rear patio

ARG Mason at SE Corner

Checking Great Wall System for Touchups

Great Wall is Painted

Cold Air Returns are Cleaned & Covered

During Construction - Heat Registers are Cleaned & Covered

Kitchen Before Painting

Protected Kitchen Cabinets

Laundry Floor is Protected

Master Bathroom Cabinets and Floor are Covered Before Painting

Covered Doors Before Painters Start

Basement Bathroom Vanity

Master Shower Tiles

Foam Insulation for Basement Walls is Delivered

Stucco Top Coat is Finished

Stucco 2nd Coat is Finished

From Left - Stucco, J Metal, Gap for Sealant, Window Frame, Red Protective Tape

Great Wall Systems Detail

Finished Section of Great Wall

Outdoor Kitchen

Mailbox Monument is Framed

Rear Concrete Patio is Protected with Old Carpets

Partial Kitchen Cabinets

Bookshelves in Study

Study Doors with Crystal-Vu Glass

Interior Alder Doors

Entry Floor Inlay

Ditra Title Underlayment

Laundry Room Floor - In Progress

Master Bath Floor - In Progress

Installing Tile in the Master Bath

Cabinets Delivered

Future Island

Radius Soffit in Master Bath

Rear Patio

Reinforcement at Rear Patio

Gas & Electric - Future BBQ Island

Drain Plane at Electrical

Future Gate Opening

Concrete Fence Installation in Progress

Installing Great Wall System Concrete Fence

Off Loading Concrete Fence Panels

Precast Concrete Fence Posts

Garage Doors Installed

Cedar Soffit Above Entry

Cedar Soffit at Entry

Cedar Soffit at Rear Patio

Caissons for Concrete Wall

Trench for Gas Connection Under Rear Patio

Durock around Master Tub

Durock in Master Shower

Round Walls

Octagon Ceiling

Study Ceiling

Wet Bar

Gathering Room Entertainment Center

Guest Suite #2

Drywall Installer

Stairs are Protected with Plywood

Hardwood Floor Delivered & Protected

Garage Floors are Protected

Carlos Checking Studs Before Drywall

Knee Wall for Kitchen Island

Bath Tub Installed in Basement

Shower Pan Installed

Main Stairs Installed - View from Basement

Main Stairs Installed - View from Main Floor

Fireplace is Protected with Plywood

Attic Buffers Installed in Every Truss Bay

Walls are Netted and Insulated with Cellulose

Garage Walls are being Insulated

Insulation Tech Blowing Cellulose

Netting Installed in Octagon Ceiling for Cellulose Insulation

Insulation Work is Starting

Windows are Sealed with Expandable Foam

Truss Reinforcements under Solar Panels

Garage Door is Trimmed

Finished Fascias at Front of Home

Finished Fascias

Fascia Detail

View from Entry to Gathering Room

Pipe Flashing

Pipe Flashing

Pipe Flashing

Basement Plumbing

Plumbing in Basement

Large Arch in Basement

Octagon Soffit at Basement Bar

Basement Entertainment Center

Rim Boards & Sill Plates are Insulated with Spray Foam

Carlos Working on Firestops

Basement Soffits Under Construction

Basement Window Detail

Main Stair Landing Under Construction

Entertainment Center and Fireplace

Insulated Header

All Headers are Insulated w/ Styrofoam

Arched Opening by Entry

Morning Room Ceiling