Powder Room with Furniture Vanity
|
|
|
|
Master Bath in Progress
|
|
|
|
Kitchen Cabinetry Near Completion
|
|
|
|
|
Entry Door
|
|
|
|
View of Deck from the West
|
|
|
|
Dekstone Pavers Completed
|
|
|
|
|
Deck Off Dining Room
|
|
|
|
Front Steps Formed
|
|
|
|
Starting Forms for Front Porch - Note Safety Caps on Rebar
|
|
|
|
|
What's All the Commotion About??
|
|
|
|
Portable Line Pump for Porch Pour
|
|
|
|
Rebar Dowelled into Foundation
|
|
|
|
|
Rebar at Porch Steps & Landing
|
|
|
|
Rebar Throughout Front Porch from West End
|
|
|
|
Rebar Throughout Front Porch
|
|
|
|
|
Completed Reinforcing at Radius
|
|
|
|
Final Steel Details at Radius Form
|
|
|
|
Cribbing for Porch Pour at Concrete Cantilever
|
|
|
|
|
|
Stone Accent in Wine Room
|
|
|
|
Built-In for Office Equipment & Supplies
|
|
|
|
Fan and Shelf Unit in Study
|
|
|
|
|
Master Bedroom Fan - Note the Reading Spots over Future Bed
|
|
|
|
Master Bath Granite with Undermount Sink
|
|
|
|
Granite Install in Progress
|
|
|
|
|
West Deck Complete - Ready for Rail Welding
|
|
|
|
Deck Pavers Partially Done
|
|
|
|
Deck Paver Install in Progress
|
|
|
|
|
Deck Pavers Shipped from California
|
|
|
|
Garage Door Ready for Metal Straps
|
|
|
|
Retaining Wall at Master Patio in Progress
|
|
|
|
|
Stone in Progress - Ready for Sills
|
|
|
|
Gutters & Downspouts Next
|
|
|
|
Stucco & Trim Finish Complete
|
|
|
|
|
|
Master 2-Sided Fireplace Shared with Study
|
|
|
|
Master Shower Listelle
|
|
|
|
Travertine at Master Shower Walls
|
|
|
|
|
Pat Grouting Basement Bath Shower - Quite a Messy Process
|
|
|
|
Specialty Tile Underlay for Radiant Heat
|
|
|
|
Study Desktop Ready for Stain & Lacquer
|
|
|
|
|
Future Kitchen Island
|
|
|
|
Cabinets in Progress
|
|
|
|
Kitchen Cabinets in Progress
|
|
|
|
|
Deck Posts Complete
|
|
|
|
Hand Troweled Texture being Applied
|
|
|
|
Tradesman Applying Hand Troweled Finish
|
|
|
|
|
Base Color Coat Completed at Dining Room & Deck Areas
|
|
|
|
Base Color Coat Being Applied
|
|
|
|
Scratch Coat Complete - Ready for Cure
|
|
|
|
|
Stucco Metal at Window Trim
|
|
|
|
Post & Deck Flashing - West Deck
|
|
|
|
Post Flashing for Stucco
|
|
|
|
|
J-Metal at Deck Posts for Stucco
|
|
|
|
Foam & Lathe at Kitchen Wall
|
|
|
|
Foam Layer at Stucco System Adds to R-Value
|
|
|
|
|
Drywall Hung in Master Bedroom
|
|
|
|
Durarock at Fireplace Surround
|
|
|
|
Great Room Windows
|
|
|
|
|
|
T&G Cedar at Flat Ceiling - West Deck
|
|
|
|
Drywall Complete at Kitchen Ceiling
|
|
|
|
Drywall in Progress at Entry
|
|
|
|
|
Blown Insulation at Exterior Wall, Batts for Sound at Study Wall
|
|
|
|
Blown Insulation at Truss
|
|
|
|
Blown Climate Pro Fiberglass Insulation at Ceilings
|
|
|
|
|
Batt Insulation for Sound Mitigation - Laundry Room to Master Suite
|
|
|
|
Insulation Netting at Great Room
|
|
|
|
Upgrade to Spider Insulation - A Johns Manville Product
|
|
|
|
|
|
Elk Along Richmond Hill Road
|
|
|
|
Boiler in Basement
|
|
|
|
Radiant Heat Tubing Installed
|
|
|
|
|
Onix Tubing Stapled Up to 1st Floor Plywood
|
|
|
|
Partial Radiant Valves in Progress
|
|
|
|
Future Radiant Manifold
|
|
|
|
|
Rigid Thermax Insulation at Unfinished Basement
|
|
|
|
Blown-In Fiberglass Insulation
|
|
|
|
Netting for Insulation Installed in Study
|
|
|
|
|
Insulation Netting in Kitchen in Progress
|
|
|
|
Closed Cell Foam for Air Seal & Partial Insulation
|
|
|
|
Interior Caulking & Air Seal in Progress
|
|
|
|
|
Tub Installed in Lower Btah
|
|
|
|
Attic Buffers Installed
|
|
|
|
Nate Resoldering Test Line at Kitchen Island
|
|
|
|
|
Cedar Soffit at Entry
|
|
|
|
West Deck T&G Ceiling in Progress
|
|
|
|
Quickflash at Exterior Projections
|
|
|
|
|
|
Deck Post Framing & Deck Timbers
|
|
|
|
Deck Post Framing & Timbers
|
|
|
|
Entry Posts are Framed
|
|
|
|
|
Deck Posts are Framed
|
|
|
|
Deck Posts
|
|
|
|
Treated Plywood at Concrete Pads
|
|
|
|
|
Basement Ceiling
|
|
|
|
Study Ceiling Lights
|
|
|
|
Radon Fan in Basement Installed
|
|
|
|
|
Main Breaker Box in Basement
|
|
|
|
Work of Electricians
|
|
|
|
Electrician Steve Working in Family Room
|
|
|
|
|
Sides of Finish Stairs are Protected with Custom Cut Plywood
|
|
|
|
Main Stairs Installed
|
|
|
|
Delivered Stairs in Garage Before Installation
|
|
|
|
|
Bottom of Bay Window is Framed for 12 inches of Insulation
|
|
|
|
Exterior Door Trim Detail
|
|
|
|
Temp Entry Door & Sidelites
|
|
|
|
|
Window Trim Completed at Master Bath Area
|
|
|
|
Kitchen Bay Window Detail
|
|
|
|
Kitchen Bay Window & Door to Family Room
|
|
|
|
|
Family Room Window Trim Installed
|
|
|
|
Dining Room Wall with Window Trim Finished
|
|
|
|
Dining Room Window Trim in Progress
|
|
|
|
|
Vycor Flashing Around Study Windows
|
|
|
|
Middle of April - 18 Degrees
|
|
|
|
Lightning Cables are Installed
|
|
|
|
|
Front of House with Windows Installed
|
|
|
|
Master Fireplace & Sliding Glass Doors to Future Patio
|
|
|
|
Future Master Patio
|
|
|
|
|
Master Suite Windows are Installed
|
|
|
|
Windows by the Entry
|
|
|
|
Vycor Flashing Around All Windows Before Trim is Installed
|
|
|
|
|
Energy Efficient Sierra Pacific Windows
|
|
|
|
Scaffold by Family Room
|
|
|
|
Carlos & Daniel Working on Vycor Flashing
|
|
|
|
|
Titanium UDL Underlayment Ice & Water Shield in All Valleys
|
|
|
|
Partial Roof Stock in Progress
|
|
|
|
Eave Flashing & 1st Piece of Ice & Water Shield in Progress
|
|
|
|
|
|
Great Room Woodburning Fireplace
|
|
|
|
Rear Elevation Showing Chimney
|
|
|
|
Chimney is Framed
|
|
|
|
|
Detail of Garage Exposed Beam
|
|
|
|
Garage Fascias
|
|
|
|
Fascias & Soffits Detail
|
|
|
|
|
Detail of Fascia Corner
|
|
|
|
Soffit Corner Detail
|
|
|
|
Soffit Detail
|
|
|
|
|
Cedar Fascias & Soffits
|
|
|
|
Framers Working on Fascias at Front of House
|
|
|
|
Carlos Nailing the Difficult Part of the Soffit
|
|
|
|
|
Carlos & Daniel Installing Soffit Vents - Blocks are 16 OC
|
|
|
|
Beams in Gable
|
|
|
|
Daniel Workin on Entry Gable
|
|
|
|
|
|
Range Hood with Arched Niche
|
|
|
|
Range Hood
|
|
|
|
Shoe Niche by Stairs
|
|
|
|
|
Powder Room Recessed Window
|
|
|
|
Powder Room Niche
|
|
|
|
Master Shower
|
|
|
|
|
Plumbing Under Master Bedroom
|
|
|
|
Plumbing
|
|
|
|
One of Triple Niches in Basement
|
|
|
|
|
Dropped Ceiling in Basement Around Steel Beams
|
|
|
|
Post and Knee Wall in Basement
|
|
|
|
Bathroom Fans Installed
|
|
|
|