14053 SHILOH RIDGE ROAD

The following are photos of the construction progress on the Shiloh Ridge Site.

Click on photos to enlarge:

Powder Room with Furniture Vanity

Master Bath in Progress

Kitchen Cabinetry Near Completion

Entry Door

View of Deck from the West

Dekstone Pavers Completed

Deck Off Dining Room

Front Steps Formed

Starting Forms for Front Porch - Note Safety Caps on Rebar

What's All the Commotion About??

Portable Line Pump for Porch Pour

Rebar Dowelled into Foundation

Rebar at Porch Steps & Landing

Rebar Throughout Front Porch from West End

Rebar Throughout Front Porch

Completed Reinforcing at Radius

Final Steel Details at Radius Form

Cribbing for Porch Pour at Concrete Cantilever

Stone Accent in Wine Room

Built-In for Office Equipment & Supplies

Fan and Shelf Unit in Study

Master Bedroom Fan - Note the Reading Spots over Future Bed

Master Bath Granite with Undermount Sink

Granite Install in Progress

West Deck Complete - Ready for Rail Welding

Deck Pavers Partially Done

Deck Paver Install in Progress

Deck Pavers Shipped from California

Garage Door Ready for Metal Straps

Retaining Wall at Master Patio in Progress

Stone in Progress - Ready for Sills

Gutters & Downspouts Next

Stucco & Trim Finish Complete

Master 2-Sided Fireplace Shared with Study

Master Shower Listelle

Travertine at Master Shower Walls

Pat Grouting Basement Bath Shower - Quite a Messy Process

Specialty Tile Underlay for Radiant Heat

Study Desktop Ready for Stain & Lacquer

Future Kitchen Island

Cabinets in Progress

Kitchen Cabinets in Progress

Deck Posts Complete

Hand Troweled Texture being Applied

Tradesman Applying Hand Troweled Finish

Base Color Coat Completed at Dining Room & Deck Areas

Base Color Coat Being Applied

Scratch Coat Complete - Ready for Cure

Stucco Metal at Window Trim

Post & Deck Flashing - West Deck

Post Flashing for Stucco

J-Metal at Deck Posts for Stucco

Foam & Lathe at Kitchen Wall

Foam Layer at Stucco System Adds to R-Value

Drywall Hung in Master Bedroom

Durarock at Fireplace Surround

Great Room Windows

T&G Cedar at Flat Ceiling - West Deck

Drywall Complete at Kitchen Ceiling

Drywall in Progress at Entry

Blown Insulation at Exterior Wall, Batts for Sound at Study Wall

Blown Insulation at Truss

Blown Climate Pro Fiberglass Insulation at Ceilings

Batt Insulation for Sound Mitigation - Laundry Room to Master Suite

Insulation Netting at Great Room

Upgrade to Spider Insulation - A Johns Manville Product

Elk Along Richmond Hill Road

Boiler in Basement

Radiant Heat Tubing Installed

Onix Tubing Stapled Up to 1st Floor Plywood

Partial Radiant Valves in Progress

Future Radiant Manifold

Rigid Thermax Insulation at Unfinished Basement

Blown-In Fiberglass Insulation

Netting for Insulation Installed in Study

Insulation Netting in Kitchen in Progress

Closed Cell Foam for Air Seal & Partial Insulation

Interior Caulking & Air Seal in Progress

Tub Installed in Lower Btah

Attic Buffers Installed

Nate Resoldering Test Line at Kitchen Island

Cedar Soffit at Entry

West Deck T&G Ceiling in Progress

Quickflash at Exterior Projections

Deck Post Framing & Deck Timbers

Deck Post Framing & Timbers

Entry Posts are Framed

Deck Posts are Framed

Deck Posts

Treated Plywood at Concrete Pads

Basement Ceiling

Study Ceiling Lights

Radon Fan in Basement Installed

Main Breaker Box in Basement

Work of Electricians

Electrician Steve Working in Family Room

Sides of Finish Stairs are Protected with Custom Cut Plywood

Main Stairs Installed

Delivered Stairs in Garage Before Installation

Bottom of Bay Window is Framed for 12 inches of Insulation

Exterior Door Trim Detail

Temp Entry Door & Sidelites

Window Trim Completed at Master Bath Area

Kitchen Bay Window Detail

Kitchen Bay Window & Door to Family Room

Family Room Window Trim Installed

Dining Room Wall with Window Trim Finished

Dining Room Window Trim in Progress

Vycor Flashing Around Study Windows

Middle of April - 18 Degrees

Lightning Cables are Installed

Front of House with Windows Installed

Master Fireplace & Sliding Glass Doors to Future Patio

Future Master Patio

Master Suite Windows are Installed

Windows by the Entry

Vycor Flashing Around All Windows Before Trim is Installed

Energy Efficient Sierra Pacific Windows

Scaffold by Family Room

Carlos & Daniel Working on Vycor Flashing

Titanium UDL Underlayment Ice & Water Shield in All Valleys

Partial Roof Stock in Progress

Eave Flashing & 1st Piece of Ice & Water Shield in Progress

Great Room Woodburning Fireplace

Rear Elevation Showing Chimney

Chimney is Framed

Detail of Garage Exposed Beam

Garage Fascias

Fascias & Soffits Detail

Detail of Fascia Corner

Soffit Corner Detail

Soffit Detail

Cedar Fascias & Soffits

Framers Working on Fascias at Front of House

Carlos Nailing the Difficult Part of the Soffit

Carlos & Daniel Installing Soffit Vents - Blocks are 16 OC

Beams in Gable

Daniel Workin on Entry Gable

Range Hood with Arched Niche

Range Hood

Shoe Niche by Stairs

Powder Room Recessed Window

Powder Room Niche

Master Shower

Plumbing Under Master Bedroom

Plumbing

One of Triple Niches in Basement

Dropped Ceiling in Basement Around Steel Beams

Post and Knee Wall in Basement

Bathroom Fans Installed