Hardwood Floor Protected
|
|
|
|
Plastic Barriers for Dust Protection
|
|
|
|
Zip Door in Plastic Barriers
|
|
|
|
|
Existing Railing Protected
|
|
|
|
New Lumber Delivered
|
|
|
|
Dumpster Delivered
|
|
|
|
|
Doors & Cabinets Saved
|
|
|
|
Door Jambs Saved
|
|
|
|
Carpet Rolled, Trims and Baseboards Saved
|
|
|
|
|
Middle of Demolition
|
|
|
|
Drywall Removed from Walls
|
|
|
|
Floor After Demolition
|
|
|
|
|
Was Wet Bar Area
|
|
|
|
Old Bathroom Closet
|
|
|
|
Drywall Removed so We can Hang New Wall
|
|
|
|
|
Basement Vacuumed, Bottom Plates Nailed
|
|
|
|
Future Closet
|
|
|
|
New Material Moved Inside
|
|
|
|
|
|
Openings in Deck Framed for Grates
|
|
|
|
Bathroom Enlarged
|
|
|
|
New Hallway with 45 Degree Walls
|
|
|
|
|
New Bedroom with Closet
|
|
|
|
45 Degree Soffit Over Entry to Great Room
|
|
|
|
Future Access to the Back of the Mechanical Room
|
|
|
|
|
Kid's Hide-a-way Under Stairs is Framed
|
|
|
|
New Electric Wiring
|
|
|
|
Low Voltage Wiring for TV
|
|
|
|
|
Electric Wiring by Mechanical Room
|
|
|
|
Some Walls are Hung Over Old Drywall
|
|
|
|
Some Walls are Hung on Steel Straps
|
|
|
|
|
This Wall was Hung Very Tight Behind Drain Pipe
|
|
|
|
Old Drywall Cut in Middle of Joists, Solid Backings for New Drywall
|
|
|
|
New Heat Runs are Properly Sealed for Better Air Flow
|
|
|
|
|
New Duct Works Above Bathroom Ceiling
|
|
|
|
New Heat Runs in Tray Soffits are Sealed
|
|
|
|
Framing Around Heat Run in Storage Room
|
|
|
|
|
New Can Lights Installed
|
|
|
|
New Grates Installed on Deck for Safety and More Light
|
|
|
|
Grate Let More Light in Basement
|
|
|
|
|
Large Closet in Great Room
|
|
|
|
Blocks for TV, Wall Hung on Anchor Bolts
|
|
|
|
Architectural Tray Ceiling
|
|
|
|
|
Single Stud Bay Insulation Repaired
|
|
|
|
Insulated Space Under Stairs
|
|
|
|
Walls Insulated with Blown Fiberglass for Additional Comfort
|
|
|
|
|
|
Drywall Finished at Tray Ceiling in Rec Room
|
|
|
|
Re-work of Existing Drywall & Primer at Ceiling
|
|
|
|
Future Deck Opening for Grate at Bedroom Window
|
|
|
|
|
Stair Wall Ready for Rail
|
|
|
|
Re-hung Existing Door & Dropped Ceiling Detail at New Ductowrk
|
|
|
|
Salvaged Materials Stored in the Garage
|
|
|